Plumbers · OL5
4 potential projects within 5 miles of OL5.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 4 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Ashton Community Fire Station Slate Lane Audenshaw Tameside M34 5FS
91% historically approved · decision due ~22 Sep
Implementation of a water source heat pump and an ASHP to replace the existing natural gas powered boiler and associated works.
Awaiting decision Full applications 14 docs -
Tameside General Hospital Fountain Street Ashton-under-lyne Tameside OL6 9RW
91% historically approved · decision due ~22 Jul
Construction of a new energy centre and compound within the existing car park adjacent to the Charlesworth Building, including two Water Source Heat Pumps, thermal storage, associated pipework, a generator, oil storage tanks, and two dual-fuel Low Temperature Hot Water boilers with externally mounted flues on the Charlesworth Building. All plant will be housed within steel, GRP and acoustic enclosures up to 5 metres in height and enclosed by security fencing. Four Air Source Heat Pumps will be installed on the Charlesworth building roof, and one Air Source Heat Pump will also be installed on the roof of the Pathology Building. The development also includes the installation of electric vehicle charging comprising ten charging points, five charging pedestals and a distribution board housed within a GRP enclosure adjacent to the chargers.
Awaiting decision Full applications 49 docs -
The Hurst Laundry 1930 Ltd Holden Street Ashton-under-lyne Tameside OL6 9JB
91% historically approved · decision due ~2 Jun
Co-living scheme (Sui Generis) comprising 36 units (incl. ensuite and kitchenettes), shared communal kitchen/dining facilities, communal social space and gym, a publicly accessible café and launderette (Use Class E) and 4 self contained flats.
Awaiting decision Full applications New dwelling 53 docsMajor scheme -
The Barn Green Lane Strinesdale Oldham OL4 3RB
82% historically approved · decision due ~3 Apr
1) Conversion of existing barn to a single residential dwelling, including a single storey side extension and alterations 2) Removal of hay store 3) Demolition of remaining outbuilding structure 4) Erection of a single storey ancillary outbuilding 5) Installation of boundary treatments, landscaping works, and associated drainage infrastructure.
Awaiting decision Full applications Extension Demolition 26 docsSmall domestic
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.