Electricians · NR33
10 potential projects within 5 miles of NR33.
From the planning register, over the last 12 months, matched to the work electricians do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 8 |
| Prior approval | 2 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Butchers Barn Adjacent Sunnyside The Street Rushmere Lowestoft Suffolk NR33 8ET
Proposed Cart Shed - Array of solar panels on roof - 8kw
Granted Full applications 13 docsSmall domestic -
61 Royal Avenue Lowestoft Suffolk NR32 4HJ
Restrospective application - Installation of EV charger
Granted Full applications 14 docs -
Africa Alive Whites Lane Kessingland Lowestoft Suffolk NR33 7TF
Prior-Notification - Installation of a 125 kWp solar canopy for onsite renewable electricity generation and self-consumption. The 125 kWp capacity is subject to solar PV module availability at time of installation.
Granted Prior approval 7 docs -
Africa Alive Whites Lane Kessingland Lowestoft Suffolk NR33 7TF
Prior-Notification - Installation of a 95 kWp solar canopy at Africa Alive's workshop for onsite renewable electricity generation and self-consumption. The 95 kWp capacity is subject to solar PV module availability at time of installation.
Granted Prior approval 7 docs -
Dairy Farm Burgh Road Wheatacre Norfolk NR34 0BZ
83% historically approved · decision due ~7 Oct
Solar panel ground array with a generation capacity of approx. 215.04 kWp and two containerised battery energy storage units, each with a capacity of 120 kWh, together with associated ancillary infrastructure.
Awaiting decision Full applications 21 docs -
Dairy Farm Burgh Road Wheatacre Norfolk NR34 0BZ
84% historically approved · decision due ~7 Oct
Solar panel ground array with a generation capacity of approx. 215.04 kWp and two containerised battery energy storage units, each with a capacity of 120 kWh, together with associated ancillary infrastructure.
Awaiting decision Full applications 21 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.