Skip to content
PlanIndex Get alerts
Menu

Electricians · ML6

4 potential projects within 5 miles of ML6.

From the planning register, over the last 12 months, matched to the work electricians do. Every one of these is a real application at a real address.

4 Applications near you Within 5 miles of ML6, over the last 12 months
2 Already approved Permission granted. Most have nobody booked yet.
1 Kinds of work Matched to what a electrician does

Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.

What kind of work it is

Over the last 12 months

Kind of applicationNear you
Full applications 4

A few of them

Approvals first, because an approval is a budget looking for a builder

  • Whites Filling Station Edinburgh Road Newhouse North Lanarkshire ML1 5SY

    25/01051/FUL Submitted 26 Sep 2025 North Lanarkshire

    Demolition of existing forecourt shop and canopy, existing dwellinghouse and other ancillary sheds and construction of replacement forecourt shop with upper floor flatted accommodation. New forecourt canopy, installation of additional fuel pumps, 2x jet wash bays, 3x EV charge points and formation of 30 number parking spaces.

    Granted Full applications Demolition 15 docs
    Domestic
  • 203 Eastfield Road Caldercruix North Lanarkshire ML6 7RP

    25/01243/FUL Submitted 21 Nov 2025 North Lanarkshire

    Installation Of 2no. Air Source Heat Pumps (As Installed)

    Granted Full applications 7 docs
  • 5 Stanley Park North Biggar Road Airdrie North Lanarkshire ML6 6EJ

    26/00665/FUL Submitted 2 Jun 2026 North Lanarkshire

    97% historically approved · decision due ~26 Aug

    Installation of Solar Panels

    Decided Full applications
  • Land At Biggar Road Newarthill Motherwell North Lanarkshire

    26/00190/FUL Submitted 26 Feb 2026 North Lanarkshire

    97% historically approved · decision due ~5 May

    Installation of a ground-mounted solar photovoltaic (PV) array, Battery Energy Storage System (BESS) and associated infrastructure.

    Awaiting decision Full applications 63 docs

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode