Plumbers · M28
6 potential projects within 5 miles of M28.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 6 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Unit G8, Barton Hall Industrial Estate, Hardy Street, Eccles, Manchester, M30 7NB
Erection of a wash bay canopy, with associated wash equipment, drainage infrastructure and ancillary works
Granted Full applications 11 docs -
Plot 3, Stadium Way, Eccles, M30 7EY
Erection of commercial units within Classes B2, B8 and E(g)(iii) with associated parking, landscaping and infrastructure. Alterations to site wide drainage arrangements for Salford Community Stadium. Access to Salteye Brook for maintenance arrangements.
Granted Full applications 122 docs -
Land at Booths Bank Farm, Leigh Road, Boothstown, Worsley, M28 1LL
Demolition of existing buildings, change of use and temporary installation of 8 no. padel courts with roof canopies for use as outdoor Padel Sports and Recreation (Use Class F2(c)) along with change of use of former Clock Works building to provide ancillary facilities including changing rooms, showers, reception area, office space and café/bar (sui generis) for an operational period of seven years, along with associated access, groundworks, drainage, lighting, servicing and car and cycle parking, and any other works.
Withdrawn Full applications Demolition 73 docs -
Spa Mill Spa Road Bolton BL1 4AG
CHANGE OF USE FROM VACANT LAND TO HAND CAR WASH AND VALETING FACILITY (SUI GENERIS) TOGETHER WITH ERECTION OF TIMBER CABIN, CANOPIES, BOUNDARY FENCING AND GATES, DRAINAGE INFRASTRUCTURE AND ASSOCIATED VEHICLE ACCESS AND CIRCULATION ARRANGEMENTS.
Refused Full applications 10 docs -
Harriet Street Playing Fields, Hill Top Road, Walkden, Salford, M28 3EW
84% historically approved · decision due ~13 Apr
Proposed creation of 5no. new grass pitches through regrading and profiling of the site, installation of a new pitch drainage system, associated landscaping works including 32no. new car park spaces, and new access gained from Louisa Street.
Awaiting decision Full applications 51 docs -
Stand Golf Club, Ashbourne Grove, Radcliffe, Manchester, M45 7NL and land to east of Ringley Road, M45 7LN
90% historically approved · decision due ~17 Mar
Re-location of the clubhouse from Ashbourne Grove (Site A) to land to east of Ringley Road (Site B); Erection of 43 no. dwellings (Class C3) and erection of 60 no. retirement-living apartments (Class C3) in site A; Reconfiguration of numbering of the golf course holes to provide the start (Hole #1) and the finish (Hole #18) to coincide with the new replacement clubhouse facility; Associated access, parking, landscaping, drainage and infrastructure works
Awaiting decision Full applications New dwellingMajor scheme
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.