Landscapers · KY15
1 potential project within 5 miles of KY15.
From the planning register, over the last 12 months, matched to the work landscapers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Conditions | 1 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Ferrymuir Energy Battery Storage Stratheden Cupar Fife KY15 5RW
99% historically approved · decision due ~5 Oct
Proposed erection of battery storage compound (49.9MW) comprising of containerised battery storage units and installation of boundary fence and associated works (increase in capacity from 19.99MW permitted under 18/02245/FULL) (Non-Material Variation to reflect the augmentation of the existing Ferrymuir Battery Energy Storage System from a one-hour to a two-hour configuration. he proposed variation comprises the extension of existing concrete battery bases, the repositioning and consolidation of existing battery racks, and the installation of 12 additional DC battery containers on the vacated battery-unit bases. The revised arrangement retains the existing maximum import and export capacity of 49.9 MW to planning permission 19/02750/FULL)
Awaiting decision Conditions Extension 3 docsSmall domestic
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.