Plumbers · G78
7 potential projects within 5 miles of G78.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 7 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Land Adjacent To The North, North-west, West And South-west Sides Of Balgray Reservoir, East Renfrewshire.
Construction of 3m wide asphalt path and upgrading existing path to 3m asphalt path; formation of grass path in area to the west of Aurs Road; construction of entrance features with paving and walling; installation of seating, cycle racks, signs and bollards; installation of drainage including SUDS; upgrading/re-surfacing of car park adjacent to Balgraystone Road.
Granted Full applications 23 docs -
15 Dunure Drive Newton Mearns East Renfrewshire G77 5TH
Erection of single storey front extension incorporating porch and toilet/shower room
Granted Full applications Extension 4 docsSmall domestic -
East Renfrewshire Golf Club Ayr Road Newton Mearns East Renfrewshire G77 6RT
Reprofiling of existing golf course ground levels to create a new driving range and alterations to two existing golf holes with associated landscaping and drainage works (major)
Granted Full applications 22 docs -
Site On South Eastern Boundary Of Nos 19 And 21 Main Road At Newton Drive Elderslie Johnstone
Engineering works comprising reconfiguration of ground levels and formation of mounds with associated drainage and landscaping (in part retrospect)
Granted Full applications 12 docs -
Site Between Nos 45 To 79 Balmoral Road And Auchenlodment Road Elderslie Johnstone
97% historically approved · decision due ~7 May
Erection of residential development comprising 32 dwellinghouses with associated works to include access roads, drainage infrastructure and landscaping
Awaiting decision Full applications New dwelling 247 docsMajor scheme -
Land East Of Holehouse Brae, Neilston, East Renfrewshire
92% historically approved · decision due ~31 Dec
Installation of off site foul drainage pipes; installation of off site surface water drainage pipes and headwall outfall to the Levern Water (associated with proposed residential development 2025/0640/TP)
Awaiting decision Full applications New dwelling 11 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.