Landscapers · FK2
5 potential projects within 5 miles of FK2.
From the planning register, over the last 90 days, matched to the work landscapers do. Every one of these is a real application at a real address.
What kind of work it is
Over the last 90 days
| Kind of application | Near you |
|---|---|
| Conditions | 5 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
The Carron Centre Ronades Road Falkirk FK2 7TA
97% historically approved · decision due ~19 Oct
Compliance with Conditions of P/25/0085/FUL - Construction of 78 Dwellings with Associated Landscaping, Access and Infrastructure
Awaiting decision ConditionsMajor scheme -
The Carron Centre Ronades Road Falkirk FK2 7TA
97% historically approved · decision due ~30 Sep
Compliance with Conditions of P/25/0085/FUL - Construction of 78 Dwellings with Associated Landscaping, Access and Infrastructure
Awaiting decision ConditionsMajor scheme -
Land To The North Of Crownerland Farm Linlithgow
97% historically approved · decision due ~25 Sep
Compliance with Conditions of P/26/0061/MSC - Approval of Matters Specified in Conditions to Address Conditions 1(a), (b), (c), (d), (e), (f), (g), (h) and 11 of P/17/0797/PPP as Varied by P/26/0024/VRC (Relating to Amendments to P/22/0042/MSC Comprising the Substitution and Remix of 70 Dwellinghouses, and Amendments to Drainage, Landscaping, and Associated Works)
Awaiting decision ConditionsMajor scheme -
Land To The North Of Crownerland Farm Linlithgow
97% historically approved · decision due ~24 Aug
Compliance with Condtions 15, 18 and 19 of P/22/0042/MSC - Construction of 201 Dwellinghouses and 24 Flats, Associated Infrastructure, Drainage and Landscaping
Awaiting decision Conditions New dwellingMajor scheme -
Land To The East Of Gilston Farm Gilston Crescent Polmont
Amendment to P/24/0374/MSC - Approval of Matters Specified in Conditions 1A, 1D-K, 1U-V, 1X, 1AA, 1EE-FF, 3 and 6 Relating to Phase 1 Construction of 98 Dwellinghouses (Finished Floor Levels, Siting, Design, and External Appearance, Access and Street Layout, Landscaping and Open Space/ Play, Pedestrian and Cycle Facilities, Boundary Treatments, Surface Water Drainage and Flood Measures, Noise Mitigation, Residential Travel Pack, Car Parking Including Electric Vehicle Charging, and Waste Collection and Storage) of Planning Permission in Principle P/20/0493/PPP
Withdrawn ConditionsMajor scheme
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.