Groundworkers · EN2
64 potential projects within 5 miles of EN2.
From the planning register, over the last 90 days, matched to the work groundworkers do. Every one of these is a real application at a real address.
What kind of work it is
Over the last 90 days
| Kind of application | Near you |
|---|---|
| Householder | 32 |
| Full applications | 32 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
100 Tolmers Road Cuffley Potters Bar EN6 4JJ
Front boundary alterations including new vehicular access gates and minor soft landscaping alterations
Granted HouseholderDomestic -
28 Coniston Road, Hornsey, London, N10 2BP
New window to the front bay at basement light well level, new bin store, demolition of existing garden wall, new stair down to basement and new store room.
Granted Householder Demolition Windows or glazing 11 docsDomestic -
29 Sandhurst Road London N9 8BA
Single storey rear extension, detached outbuilding to rear, vehicular access and front hardstanding.
Granted Full applications Extension 6 docsSmall domestic -
20 Devonshire Gardens, Tottenham, London, N17 7NB
Construction of new vehicle hardstanding, concrete access ramp and handrails
Granted Householder 11 docsDomestic -
28 Hartland Road, Cheshunt, Hertfordshire, EN8 8QA
Two storey front and single storey side and rear extensions, new lightwell and basement extension
Granted Householder Extension 11 docsSmall domestic -
109 Rosebery Road, Hornsey, London, N10 2LD
Demolition of existing single storey rear extensions; erection of rear ground and basement level extensions; alteration to rear and side fenestration; changes of timber windows to double glazed timber windows; erection of rear dormer extension; installation of 4 no. front rooflights; and other associated works.
Granted Householder Extension Loft or dormer +2 57 docsSmall domestic
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.