Skip to content
PlanIndex Get alerts
Menu

Electricians · DN5

3 potential projects within 5 miles of DN5.

From the planning register, over the last 12 months, matched to the work electricians do. Every one of these is a real application at a real address.

3 Applications near you Within 5 miles of DN5, over the last 12 months
1 Already approved Permission granted. Most have nobody booked yet.
2 Kinds of work Matched to what a electrician does

Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.

What kind of work it is

Over the last 12 months

Kind of applicationNear you
Full applications 2
Prior approval 1

A few of them

Approvals first, because an approval is a budget looking for a builder

  • S Yorks Passenger Transport Leger Way Intake Doncaster DN2 6AZ

    26/00531/FUL Submitted 19 Mar 2026 Doncaster

    Installation of electrical infrastructure, including 2no Ring Main Units, 2no Transformers and 2no Feeder panels. The construction of 6no. overhead steel gantries with drop down reel chargers plus overhead steel structures that will transfer cable around the site. 28no. ground mounted Heliox Flex 250A chargers and 2no. ground mounted Siemens 400kW sicharge-D chargers 26 No. ground mounted Heliox 180 power units. Solar Panels will be fitted to the roof and erection of cycle shelters and bus wash with plant room, fuel tank and storage container.

    Granted Full applications 38 docs
  • Eco Power Stadium Stadium Way Lakeside Doncaster DN4 5JW

    26/01488/PRIOR Submitted 6 Aug 2026 Doncaster

    90% historically approved · decision due ~1 Oct

    Notification to determine if prior approval is required for the installation of Solar PV system on roof tops

    Awaiting decision Prior approval 3 docs
  • Land At Bilham Lane Hooton Pagnell Doncaster DN5 7BW

    25/02389/FULM Submitted 5 Dec 2025 Doncaster

    86% historically approved · decision due ~6 Mar

    Installation and operation of a ground mounted solar photovoltaic array, co-located battery energy storage system (BESS) together with associated infrastructure; internal access arrangements; security fencing; CCTV; Landscaping and Biodiversity net gain

    Awaiting decision Full applications
    Major scheme

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode