Electricians · DL14
6 potential projects within 5 miles of DL14.
From the planning register, over the last 12 months, matched to the work electricians do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 5 |
| Prior approval | 1 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
The Old Vicarage Brownside Lane Bolam Darlington DL2 2UP
The installation of solar panels on the garden outbuilding roof, including the installation of two Tesla Powerwall batteries in the garden store.
Granted Full applications 22 docs -
Wadsworth Barns Wadsworth Farm High Grange Crook DL15 8AU
Installation of solar panels to dwelling and garage roof
Granted Full applications 9 docsDomestic -
St Johns School And Sixth Form College A Catholic Academy Woodhouse Lane Bishop Auckland DL14 6JT
Prior Notification (Class J) for 99.64kWp Solar PV system on a combination of flat and pitched roofs
Granted Prior approval 10 docs -
34 North Bondgate Bishop Auckland DL14 7PG
The Installation of 7 roof mounted solar PV panels and 2 fixed louvre ventiliation units.
Withdrawn Full applications 10 docs -
Petrol Filling Station Redworth Road Shildon DL4 2NE
94% historically approved · decision due ~8 Jul
Extension of ancillary shop; provision of new shop compound; installation of x4 EV charging points; formalisation of existing car parking; closure of access point on Redworth Road; installation of x2 HGV petrol filling points; and installation of flood lighting.
Awaiting decision Full applications Extension 42 docs -
Land On The East Side Of Addison Road Toronto
94% historically approved · decision due ~25 Mar
Full application for the installation, construction, operation and decommissioning of a circa. 27MW solar photovoltaic (PV) farm with associated infrastructure which include substation, transformers, site access improvements, landscaping, CCTV, fencing and underground cable.
Awaiting decision Full applications 100 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.