Plumbers · CH4
6 potential projects within 5 miles of CH4.
From the planning register, over the last 90 days, matched to the work plumbers do. Every one of these is a real application at a real address.
What kind of work it is
Over the last 90 days
| Kind of application | Near you |
|---|---|
| Full applications | 6 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
5, Old Warren, Broughton, Chester, CH4 0EG
We would like to add a single story rear extension to include a small downstairs bathroom, utility space and living room.
Granted Full applications Extension 7 docs -
DARLAND SCHOOL AND SPORTS CENTRE, CHESTER ROAD, ROSSETT, WREXHAM, LL12 0DL
ENGINEERING OPERATIONS TO INSTALL NEW DRAINAGE SYSTEM AND THE SITING OF SHIPPING CONTAINERS AND LANDSCAPING WORKS
Granted Full applications 28 docs -
Briarfield, Old Aston Hill, Ewloe, Deeside, CH5 3AH
87% historically approved · decision due ~27 Oct
Construction of a new tarmac driveway with an integrated linear drainage system connected to an internal soakaway. Widening of the existing access onto the B-road to accomodate vehicles, & construction of new replacement front pillars & and a side boundary wall adjacent to the private lane, with a maximum height exceeding 1 meter.
Awaiting decision Full applicationsSmall domestic -
71, Parkfield Road, Broughton, Chester, CH4 0SA
87% historically approved · decision due ~22 Oct
Single-storey pitched roof front extension to provide a fully accessible shower room, internal and external alterations to widen doors, provision of access ramp to the side of the property. All work is under a Disabled Facilities Grant.
Awaiting decision Full applications Extension 11 docsSmall domestic -
55 Greenfields Upton Chester CH2 1LL
92% historically approved · decision due ~28 Sep
Erection of new garden room to provide additional living accommodation with ensuite and gym, following demolition of existing shed/garden room
Awaiting decision Full applications DemolitionSmall domestic -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
92% historically approved · decision due ~23 Oct
Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure. The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities. In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital. 1. New Energy Generation Compound Construction of a new Energy Generation Compound housing: ? 2 No. 5MW high efficiency gas-fired LTHW boilers ? 1 No. 11m high chimney and associated flue arrangements ? Pressurisation systems ? Expansion plant ? Water treatment equipment ? Associated mechanical services ? Building management systems ? Electrical infrastructure 2. Distribution Infrastructure Construction of: ? New primary LTHW distribution network ? Interconnecting pipework systems 3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems) ? Creche ? Longhouse ? Martindale House ? Moston Lodge ? EDTC & Postgraduate 4. Substation Construction of a new Substation housing: ? Transformer ? LV Switchboard
Awaiting decision Full applications
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.