Plumbers · CH3
7 potential projects within 5 miles of CH3.
From the planning register, over the last 12 months, matched to the work plumbers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Full applications | 7 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
23A, Carlton Avenue, Saltney, Chester, CH4 8UE
Proposed two rear single storey extensions to create an open-plan kitchen, dining, and living area, and a smaller extension to form an ensuite bathroom
Granted Full applications Extension 9 docsSmall domestic -
Land At Newton Lane Newton by Tattenhall Chester
Erection of four lodges, and associated works including car parking, drainage and landscaping
Withdrawn Full applications 26 docs -
55 Greenfields Upton Chester CH2 1LL
92% historically approved · decision due ~28 Sep
Erection of new garden room to provide additional living accommodation with ensuite and gym, following demolition of existing shed/garden room
Awaiting decision Full applications DemolitionSmall domestic -
Land At Chester Road Tattenhall Chester
Erection of 110 dwellings, provision of associated access and infrastructure works including roads, drainage infrastructure, car parking, public open space, landscaping and associated works.
Refused Full applications 283 docsMajor scheme -
The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL
92% historically approved · decision due ~23 Oct
Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure. The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities. In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital. 1. New Energy Generation Compound Construction of a new Energy Generation Compound housing: ? 2 No. 5MW high efficiency gas-fired LTHW boilers ? 1 No. 11m high chimney and associated flue arrangements ? Pressurisation systems ? Expansion plant ? Water treatment equipment ? Associated mechanical services ? Building management systems ? Electrical infrastructure 2. Distribution Infrastructure Construction of: ? New primary LTHW distribution network ? Interconnecting pipework systems 3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems) ? Creche ? Longhouse ? Martindale House ? Moston Lodge ? EDTC & Postgraduate 4. Substation Construction of a new Substation housing: ? Transformer ? LV Switchboard
Awaiting decision Full applications -
6 Heath Drive Tarvin Chester CH3 8EZ
92% historically approved · decision due ~23 Apr
First storey side extension, new ensuite window to eastern side, and covered canopy to front
Decided Full applications Extension Windows or glazing
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.