Skip to content
PlanIndex Get alerts
Menu

Electricians · CH1

7 potential projects within 5 miles of CH1.

From the planning register, over the last 90 days, matched to the work electricians do. Every one of these is a real application at a real address.

7 Applications near you Within 5 miles of CH1, over the last 90 days
1 Already approved Permission granted. Most have nobody booked yet.
1 Kinds of work Matched to what a electrician does

What kind of work it is

Over the last 90 days

Kind of applicationNear you
Full applications 7

A few of them

Approvals first, because an approval is a budget looking for a builder

  • BROUGHTON SHOPPING PARK, Chester Road, Broughton, Chester, CH4 0DP

    FUL/000564/26 Submitted 30 Jun 2026 Flintshire

    Installation of electric vehicle charging hub with associated infrastructure including lighting/CCTV.

    Granted Full applications 11 docs
  • Plot A, The Airfields, Northern Gateway, Deeside, CH5 2RD

    FUL/000618/26 Submitted 14 Jul 2026 Flintshire

    87% historically approved · decision due ~16 Sep

    Site alterations comprising the installation of plant and associated works to facilitate Electric Vehicle charging infrastructure

    Awaiting decision Full applications 9 docs
  • The Countess of Chester Hospital The Countess of Chester Health Park Liverpool Road Upton Chester CH2 1UL

    26/02179/FUL Submitted 14 Jul 2026 Cheshire West and Chester

    92% historically approved · decision due ~23 Oct

    Construction of a new Energy Generation Compound (EGC), installation of a new low temperature hot water (LTHW) distribution network, decentralised heat pump installations and associated infrastructure. The Trust has engaged Vital Energi to carry out a comprehensive installation of new heat pump equipment which will reduce the Trust?s carbon emissions. The proposed project will replace this arrangement with a modern, efficient and future-ready low temperature hot water network designed to significantly improve energy efficiency, reduce carbon emissions and provide resilience for future decarbonisation opportunities. In summary, the proposed works comprise below which will be installed, on a permanent basis, built within boundary of the Hospital. 1. New Energy Generation Compound Construction of a new Energy Generation Compound housing: ? 2 No. 5MW high efficiency gas-fired LTHW boilers ? 1 No. 11m high chimney and associated flue arrangements ? Pressurisation systems ? Expansion plant ? Water treatment equipment ? Associated mechanical services ? Building management systems ? Electrical infrastructure 2. Distribution Infrastructure Construction of: ? New primary LTHW distribution network ? Interconnecting pipework systems 3. Heat Generation and Plant Infrastructure (5 No. decentralised Air Source Heat Pump systems) ? Creche ? Longhouse ? Martindale House ? Moston Lodge ? EDTC & Postgraduate 4. Substation Construction of a new Substation housing: ? Transformer ? LV Switchboard

    Awaiting decision Full applications
  • 30 Hoole Road Chester CH2 3NJ

    26/02167/FUL Submitted 14 Jul 2026 Cheshire West and Chester

    92% historically approved · decision due ~8 Sep

    Single storey rear extension. Raised roof to side elevation, with solar panels and rooflight on rear elevation. Outbuilding roof pitch raised to create ancillary accommodation. Side extension to incorporate a ground floor WC from the entrance hall

    Awaiting decision Full applications Extension Loft or dormer 14 docs
    Small domestic
  • 39 White Friars Chester CH1 1NZ

    26/02098/FUL Submitted 7 Jul 2026 Cheshire West and Chester

    92% historically approved · decision due ~1 Sep

    Installation of roof-mounted solar photovoltaic panels to the rear roof slope and installation of an external battery and inverter unit to the rear elevation.

    Awaiting decision Full applications 5 docs
  • MOD Sealand , Marsh Farm Road, Sealand, Deeside, CH5 2LS

    FUL/000586/26 Submitted 7 Jul 2026 Flintshire

    Installation of ground mounted photovoltaic (PV) solar arrays to provide 3MW generation capacity with ancillary infrastructure including inverters, HV / LV connection, cabling, internal access track and access gates.

    Withdrawn Full applications 20 docs

Start your 14-day Trade trial and watch this patch.

We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.

A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.

Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.

Start the 14-day trial Try another postcode