Landscapers · AB12
4 potential projects within 5 miles of AB12.
From the planning register, over the last 12 months, matched to the work landscapers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Conditions | 4 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Land At Oldfold Farm (Phase 5B) Milltimber Aberdeen AB13 0JL
Approval of matters specified in conditions 8 (drainage), 9 (archaeology), 10 (contamination), 11 (badger protection), 12 (tree survey), 13 (CEMP), 14 (SWMP), 15 (layout and design), 16 (landscaping), 17 (residential travel pack) and 18 (safe route to school) relating to Planning Permission in Principle ref 220466/S42 for the development of 74 houses, landscaping, open space and infrastructure
Granted Conditions Trees 130 docsMajor scheme -
Land At Oldfold Farm (Block G) Milltimber Aberdeen AB13 0BH
Approval of matters specified in conditions 8 (drainage), 9 (archaeology), 10 (contamination), 12 (tree survey), 13 (CEMP), 14 (SWMP), 15 (layout and design), 16 (landscaping), 17 (residential travel pack) and 18 (safe route to school) relating to Planning Permission in Principle ref 220466/S42 for the development of 37 houses, landscaping, play park and civic space
Granted Conditions Trees 123 docsMajor scheme -
Land At Doonies Farm Aberdeen
Approval of matters specified in conditions 42 b (demolition justification), d (site cross-sections), e (topographical survey), f (cut and fill operations), h (granite reuse), i (site plan), j (layout and finish of roads and access junctions), k (swept path analysis), 45 (biodiversity plan), 46 (landscaping scheme), 48 (CEMP), 49 (surface and foul drainage), 52 (transport assessment), 54 (archaeological works), 55 (protective fencing), 56 (standing buildings survey) of application 231371/PPP for site preparation and enabling works including the construction of a link road and associated accesses, formation of development plots, drainage infrastructure, hard and soft landscaping and associated development
Granted Conditions Demolition 57 docs -
Site N5 Countesswells Aberdeen
94% historically approved · decision due ~26 May
Approval of matters specified in conditions 2 excluding i (sitting and design), 3 excluding g, h, i (landscaping), 5 (street design), 10 (parking), 18 (drainage), 19 (private water supplies), 20 (CEMP) and 28 (low and zero carbon), in relation to planning permission in principle ref. 140438 for the erection of 57no. dwellings, including associated roads and infrastructure
Awaiting decision Conditions 85 docsMajor scheme
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.