Landscapers · AB11
4 potential projects within 5 miles of AB11.
From the planning register, over the last 12 months, matched to the work landscapers do. Every one of these is a real application at a real address.
Your patch is quiet, so we widened the window to the last 12 months rather than show you a near-empty quarter. The radius is unchanged: 5 miles is what the Trade plan watches.
What kind of work it is
Over the last 12 months
| Kind of application | Near you |
|---|---|
| Conditions | 4 |
A few of them
Approvals first, because an approval is a budget looking for a builder
-
Land At Doonies Farm Aberdeen
Approval of matters specified in conditions 42 b (demolition justification), d (site cross-sections), e (topographical survey), f (cut and fill operations), h (granite reuse), i (site plan), j (layout and finish of roads and access junctions), k (swept path analysis), 45 (biodiversity plan), 46 (landscaping scheme), 48 (CEMP), 49 (surface and foul drainage), 52 (transport assessment), 54 (archaeological works), 55 (protective fencing), 56 (standing buildings survey) of application 231371/PPP for site preparation and enabling works including the construction of a link road and associated accesses, formation of development plots, drainage infrastructure, hard and soft landscaping and associated development
Granted Conditions Demolition 57 docs -
Site At Edwards Square Grandhome Aberdeen
94% historically approved · decision due ~25 Jun
Approval of matters specified in conditions 3(siting / design / appearance / landscape a-h,j), 5(landscape a-g,j), 6 (drainage) and 7(street design), in relation to planning permission in principle ref. 131535 for the erection of 47 residential dwellings, infrastructure, landscaping and associated works
Awaiting decision Conditions 36 docs -
Site N5 Countesswells Aberdeen
94% historically approved · decision due ~26 May
Approval of matters specified in conditions 2 excluding i (sitting and design), 3 excluding g, h, i (landscaping), 5 (street design), 10 (parking), 18 (drainage), 19 (private water supplies), 20 (CEMP) and 28 (low and zero carbon), in relation to planning permission in principle ref. 140438 for the erection of 57no. dwellings, including associated roads and infrastructure
Awaiting decision Conditions 85 docsMajor scheme -
Phase 2D Riverside Quarter Bucksburn Aberdeen
94% historically approved · decision due ~22 May
Approval of matters specified in conditions 1 a-f (phasing, access and car parking, sitting design, landscaping, drainage and low zero carbon), 6 (waste collection), 20 (flood risk assessment), 22 (levels survey), 24 (suds) of application ref. 180079/S42 in respect of Phase 2D for erection of 37 residential units, public open space and associated infrastructure
Awaiting decision Conditions 72 docs
Start your 14-day Trade trial and watch this patch.
We'll email you when a new one appears near you, and again the day one is approved. You can see everything above from your first sign-in.
A card is needed to start, and nothing is charged for 14 days. Cancel in one click before then and you pay nothing.
Founding rate, first 50 trades. 48 places left at £29 a month. £49 a month once they're gone. Keep the plan and your rate never moves.