Registered in Perth. 5 planning applications on PlanIndex across 4 councils . Named as the applicant, not the agent. On the register from 2025 to 2026.

Where they work

What they file

  1. Full applications50%
  2. Outline50%

Company record

From Companies House. Company information only; we never show personal contact details.

Registered name
SCOTTISH HYDRO ELECTRIC TRANSMISSION PLC
Company number
SC213461
Status
Active
Incorporated
4 December 2000
Registered in
Perth

Track record

The 5 most recent applications naming this firm

  • APP/2026/1238 Awaiting decision

    Netherton Hub Land To The West Of Parkhill Farm Blackhills Peterhead

    Condition 2b)i, 2b)ii, 2b)iii, 2b)iv, 2b)v, 2b)vi, 2b)vii, 2b)viii, 2b)ix, 2b)x (Development Phase - Spittal to Peterhead HVDC Converter Station) of Planning Permission of Planning Permission ref: APP/2024/1714 for Erection of a Strategic Electricity Transmission Hub Including 400kV AC Substation, 132kV AC Substation, 2 HVDC Converter Stations, Transmission Hall, Spares Warehouse, Operations Base and Associated Works

    Submitted 20 Jul 2026
  • 2026/120/ECUCON Decided

    Between North Of Kergord Converter Station Running Generally Parallel To The A970 Before Passing Voe And Running Alongside The A968 Towards The Toft / Scatsta Area

    Pre Application Consultation Notification (PAC 2 Alignment Options)- SSEN Transmission LT622- Northern Shetland 220kV to Kergord 132kVV

    Decided 25 Jun 2026
  • 25/01657/SCO Decided

    Site Near Tomcork Dunphail Forres Moray

    Erection of 275 /132 kV substation and associated Infrastructure on

    Decided 4 Feb 2026 Outline
  • 25/01364/S37 Decided

    Beauly To Peterhead

    Install operate and keep installed approximately 186 km of new 400 kilovolt (kV) double circuit steel structure overhead transmission line (OHL) including downleads to connect into new substation sites at Fanellan (NH 48321 42717) in the area of Beauly Greens (NJ 81960 47587) in the area of New Deer and Netherton (NK 05761 45576) in the area of Peterhead The Proposed Development also includes crossing work, temporary diversions and permanent realignment works to existing 132 kV and 275 kV OHLs of approximately 14.7 km in total and ancillary development and associated works In total the Proposed Development would comprise approximately 200.7 km of new OHL infrastructure between

    Decided 17 Dec 2025
  • 25/315/PP Granted

    Houton Ferry Terminal And Toilets (Land Near) Houton Road, Orphir, Orkney

    Create an access, construct a road and footpaths, profile land to construct platforms and hardstandings, install services and drainage infrastructure, and associated landscaping, and erect two temporary accommodation units and a welfare unit and two generators (12 months)

    Decided 23 Feb 2026 Full applications

The full track record

Trade members see everything this firm has filed, filter it by council and outcome, and get an email the day it files again.